PROJECT REFERENCE

  • Berri & Marjan Project: Multiple Jacket Lifts
    October 2017

    BACKGROUND

    In October 2017 KTL Offshore was awarded the contract to design, manufacture and test 22 heavy lift slings for an offshore contractor under a long-term agreement signed with Saudi Aramco. The contract is for 17 jackets – the steel frames supporting the processing platform – for the Berri and Marjan oilfields in the Arabian Gulf. Of the 17 platforms to be built and lifted into place, will be for the Berri and 8 for the Marjan fields.

    Under the six-year LTA, contractors will be responsible for delivering a number of offshore oil and gas producing platforms, tie-in platforms, pipelines, power cables, and all the related facilities, as required under the current master plan for Saudi Aramco's offshore fields.

    Due to their compact terminations, lighter weight and easier handling characteristics as compared to hand spliced cable laid slings, the customer selected the KimLock® resin terminated cable laid sling as their preferred choice for this project.

    SCOPE OF SUPPLY:

    4x KimLock® cable laid resin terminated sling; 7.91” (201mm) dia; CSBL 1,671MT; nominal length 95ft (28.9m).
    8x KimLock® cable laid resin terminated sling; 7.91” (201mm) dia; CSBL 1,671MT; nominal length 100ft (30.5m).
    8x KimLock® cable laid resin terminated sling; 7.91” (201mm) dia; CSBL 1,671MT; nominal length 105ft (32.0m).
    2x KimLock® cable laid resin terminated sling; 8.90” (226mm) dia; CSBL 2,022MT; nominal length 100ft (30.5m).

    All slings manufactured according to the new IMCA M179 Revision 1 Guidance Note.
    Manufactured and tested at KTL Offshore (Middle East) FZC and witnessed by ABS.

    Download PDF
  • Joint Development Area (JDA) Block B-17 Field Development Project: Multiple Jacket Lifts
    October 2017

    BACKGROUND


    In October 2017 KTL Offshore was awarded the  contract to design,manufacture and test 35 heavy lift slings for the jacket lifting phase of the JDA Block 17 project in the Gulf of Thailand.Due to their compact terminations, lighter weight and easier handling characteristics as compared to hand spliced cable laid slings,the customer selected the KimLock resin terminated cable laid sling as their preferred choice for this project.The Joint Development Area (JDA) Blocks B-17 & C-19 and B-17-01 Integrated Development Project involves the phased development of gas and condensate fields in blocks covering a 4,700km² area south of the Gulf of Thailand off the coast of Thailand and Malaysia.The water depths range between 55m and 65m.These blocks contain a total of 18 gas fields.

    SCOPE OF SUPPLY:

    KimLock® cable laid resin terminated sling; 238mm dia; CSBL 2,477
    MT; nominal length 20.00 m; x2 lengths.


    KimLock® cable laid resin terminated sling; 238mm dia; CSBL 2,477
    MT; nominal length 19.90 m; x1 length.


    KimLock® cable laid resin terminated sling; 238mm dia; CSBL 2,477
    MT; nominal length 19.80 m; x1 length.


    KimLock® cable laid resin terminated sling; 238mm dia; CSBL 2,477
    MT; nominal length 19.60 m; x2 lengths.


    KimLock® cable laid resin terminated sling; 238mm dia; CSBL 2,477
    MT; nominal length 19.50 m; x3 lengths.


    KimLock® cable laid resin terminated sling; 238mm dia; CSBL 2,477
    MT; nominal length 19.40 m; x1 length.


    KimLock® cable laid resin terminated sling; 238mm dia; CSBL 2,477
    MT; nominal length 19.20 m; x2 lengths.


    KimLock® cable laid resin terminated sling; 168mm dia; CSBL 1,254
    MT; nominal length 46.00 m; x4 lengths.


    KimLock® cable laid resin terminated sling; 168mm dia; CSBL 1.254
    MT; nominal length 50.00 m; x6 lengths.


    KimLock® cable laid resin terminated sling; 132mm dia; CSBL 827
    MT; nominal length 70.60 m; x3 lengths.


    KimLock® cable laid resin terminated sling; 132mm dia; CSBL 827
    MT; nominal length 46.00 m; x4 lengths.


    KimLock® cable laid resin terminated sling; 132mm dia; CSBL 827
    MT; nominal length 40.00 m; x6 lengths.

    Download PDF
  • Karan Project : Multiple Platform Lifts
    August 2017

    BACKGROUND


    In 2017 KTL Offshore was awarded the contract to design,manufacture and test 30 heavy lift slings and grommets for the KARAN project in the Kingdom of Saudi Arabia.The slings were tested on our KT1000 horizontal test bed to ensure the critical length tolerances were achieved – one of the largest test facilities in the Middle East. The EPCI contract was awarded by Saudi Aramco, which involved the engineering, procurement, transportation and installation of offshore structures including observation platform, wellhead production deck module, auxiliary platforms, 20" internally cladded flow line and composite power cable.The Karan gas field is located offshore of the Arabian Gulf in water depths of 40m to 60m. It is the first non-associated gas field being developed in the Kingdom of Saudi Arabia.The field is owned and operated by Saudi Aramco, a state-owned oil and gas company.

    SCOPE OF SUPPLY:
    Cable Laid Grommets:
    • Dia: 228mm; length: 20.86 meters; CGBL: 4,794 MT; x2 lengths.
    • Dia: 213mm; length: 21.36 meters; CGBL: 4,061 MT; x2 lengths.
    • Dia: 213mm; length: 32.18 meters; CGBL: 3,672 MT; x2 lengths.
    • Dia: 192mm; length: 31.70 meters; CGBL: 3,384 MT; x2 lengths.
    • Dia: 162mm; length: 37.94 meters; CGBL: 2,481 MT; x2 lengths.
    • Dia: 114mm; length: 31.00 meters; CGBL: 1,156 MT; x4 lengths.
    Cable Laid Slings (Hand Spliced):
    • Dia: 225mm; length: 48.37 meters; CSBL: 1,691 MT; x2 lengths.
    • Dia: 204mm; length: 48.36 meters; CSBL: 1,418 MT; x2 lengths.
    • Dia: 204mm; length: 43.00 meters; CSBL: 1,418 MT; x2 lengths.
    • Dia: 191mm; length: 42.41 meters; CSBL: 1,278 MT; x2 lengths.
    • Dia: 176mm; length: 50.10 meters; CSBL: 1,094 MT; x2 lengths.
    • Dia: 152mm; length: 40.00 meters; CSBL: 816 MT; x2 lengths.
    • Dia: 150mm; length: 31.00 meters; CSBL: 805 MT; x2 lengths.
    • Dia: 128mm; length: 42.50 meters; CSBL: 585 MT; x2 lengths.
    Manufactured and tested at KTL Offshore (Middle East) FZC and
    witnessed by BV.

    Download PDF
  • Shah Deniz Full Field Development (FFD) Project Stage 2
    February 2017

    KimLift™ Synthetic Slings – Deep Water

    Installation

    DATE

    February 2017

    BACKGROUND

    KTL Offshore was awarded the scope of supply for 12x KimLift™ synthetic heavy lift slings to be used for the installation of deep water jackets in the Caspian Sea. The KimLift™ slings were selected due to their light weight, high strength and extreme durability and unparalleled successful track record in the heavy lift industry. The KimLift™ slings are made using HMPE synthetic material, having the same strength as the equivalent sized steel wire rope sling. When used subsea the slings have neutral buoyancy increasing hook payload as well as operational efficiency. Using our Engineered Length Control™ technology the slings were produced to 0.25% length tolerance (under load).

    The Shah Deniz field is located 90 kilometres offshore Azerbaijan in water depths of up to 550 meters. The Full Field Development project undertaken by BP is one of the largest gas development projects in the world.

     

    SCOPE OF SUPPLY:

    6x KimLift™ synthetic round slings; MBL 1,447 metric tons; 128mm; nominal length16.4 meters.

    6x KimLift™ synthetic round slings; MBL 1,447 metric tons; 128mm; nominal length16.5 meters.

    Manufactured and tested by KTL Offshore Pte Ltd (Singapore). Tested and certified by ABS at KTL Offshore (Malaysia) Sdn Bhd.

    Download PDF
  • Trat Field Development
    January 2017

    BACKGROUND

    KTL Offshore was awarded the scope of supply for the heavy lift slings and grommets to be used for the installation of multiple new wellhead platforms

    and subsea pipelines for Chevron in the Trat Field in the Gulf of Thailand.

    This project showcases spectacularly the wide range of heavy lift options KTL Offshore can offer: cable laid grommets, resin terminated cable laid

    slings as well as braided slings. Each option caters

    to a specific requirement from the customer

     

    SCOPE OF SUPPLY:

    1x KimLock™resin terminated steel wire rope cable laid sling; diameter 242mm; CSBL 2,982 MT and nominal length 12.00 meters.

    2x KimFlex™ braided steel wire rope slings ; diameter 224mm; CSBL 1,699MT and nominal length 15.50 meters.

    2x KimFlex™ braided steel wire rope slings ; diameter 224mm; CSBL 1,699MT and nominal length 17.0 meters.

    4x Cable laid steel wire rope grommets; diameter 114mm; CGBL 1,275 MT and nominal length 7.50 meters.

    Manufactured and tested by KTL Offshore (Malaysia) Sdn Bhd. Witnessed and certified by ABS.

    Download PDF
  • NASR Full Field Development Project: Multiple Jacket Lifts
    January 2017

    BACKGROUND
    In November 2016 KTL Offshore was awarded the contract to design, manufacture and test 22 heavy lift slings for the jacket lifting phase of the NASR project in Abu Dhabi. Due to their compact terminations, lighter weight and easier handling characteristics as compared to hand spliced cable laid slings, the customer selected the KimLock™ resin terminated cable laid sling as their preferred choice for this project.

    The full scope of the NASR project includes engineering, procurement, construction, installation and commissioning work for the super complex comprising  a  gas  treatment  platform,  a  separation  platform,  an accommodation platform; laying 144 km subsea power and 55 km infield cables; and modifying an existing manifold tower and two wellhead towers.

    Upon completion by the second half of 2019, the facilities will increase the daily oil production capacity of the offshore field to 65,000 barrels from the current 22,000 barrels.

    The NASR oil field is situated130 km northwest of Abu Dhabi, UAE.

    Download PDF
  • Badamyar Project: 2,000t Topside Heavy Lift
    December 2016

    BACKGROUND
    The combination of KTL Offshore’s innovative and pioneering technology in synthetic sling development and successful track record in the offshore heavy lift industry resulted in the award to design, manufacture and supply KimLift™ synthetic slings for the Badamyar topside installation project. These slings were selected over traditional steel slings due to their lighter weight which effectively increased the lifting capacity of the crane; as well as due to the difficult nature of the lifting job which involved placing two topside modules side by side on the jacket.

    This ground breaking project utilized what we believe to be the largest synthetic slings ever manufactured and used for a topside lift to date. The two modules weighed approximately
    2,000 metric tons each and were transported from the fabrication yard in Korea to site in Myanmar with the slings installed. The slings were manufactured as matched sets to 0.25% length tolerance (at load) using KTL’s Engineered Length Control™ technology. Individual proof load testing was conducted using our KimTest 3000 test bed, one of the largest and longest in the industry.

    The topsides were installed in somewhat adverse weather conditions and both were completely suspended between hook and jacket using the KimLift™ slings for up to five hours. The lifting and mating of both modules was completed successfully and without major incident. From a sling perspective, this project was the result of years of R&D, engineering and experience combining to deliver a spectacular result. It also demonstrated the suitability of KimLift™ synthetic slings for the most critical offshore lifting operation!

     

     

     

    Download PDF
  • Mariner Project (U.K) : Cable Laid Slings and Grommets
    November 2016

    BACKGROUND
    KTL Offshore was awarded the contract to manufacture and supply the steel cable laid slings and grommets for the lifting of the Topside module for the Mariner Heavy Oilfield project. The module is huge with a weight of 38,000 tones and was built in Korea and according to media reports will be mounted on the largest Jacket that Statoil has ever had built. To accomplish this lift, the largest of the cable laid slings was 360mm diameter with a CSBL of 4,620 MT. The Mariner Field is located on the East Shetland Platform of the UK North Sea, approximately 150 kilometres east of the Shetland Isles. The Mariner field consists of two shallow reservoir sections – the deeper, Maureen Formation at 1492 meters and the shallower Heimdal reservoir at 1227 meters.

     

    ITEMS
    1 x Cable Laid Sling 360mm x 59.68 meters CSBL 4620 MT
    1 x Cable Laid Sling 360mm x 59.21 meters CSBL 4620 MT
    1 x Cable Laid Sling 319mm x 59.43 meters CSBL 3707 MT
    1 x Cable Laid Sling 319mm x 58.97 meters CSBL 3707 MT
    1 x Cable Laid Sling 235mm x 59.03 meters CSBL 1907 MT
    1 x Cable Laid Sling 235mm x 57.98 meters CSBL 1907 MT
    1 x Cable Laid Sling 210mm x 53.33 meters CSBL 1594 MT
    1 x Cable Laid Sling 210mm x 52.92 meters CSBL 1594 MT
    1 x Cable Laid Sling 198mm x 50.86 meters CSBL 1338 MT
    1 x Cable Laid Sling 198mm x 51.22 meters CSBL 1338 MT
    1 x Cable Laid Sling 198mm x 59.46 meters CSBL 1338 MT
    1 x Cable Laid Sling 198mm x 58.98 meters CSBL 1338 MT
    1 x Cable Laid Grommet 213mm x 86.31 meters (Circ.) CGBL 3906 MT
    1 x Cable Laid Grommet 213mm x 86.81 meters (Circ.) CGBL 3906 MT


    All manufactured and tested by KTL Offshore in Malaysia.
    Witnessed and certified by ABS.

     

    Download PDF
  • Thien Ung Project: Cable Laid Grommets
    July 2016

    KTL Offshore was awarded the contract to manufacture and supply the steel cable laid grommets and KimSwage steel slings for the lifting of the Thien Ung top deck modules. The top decks are part of a 3,500t platform which includes a four legged jacket.

     

    The Thien Ung Gas Field is located at block 04-3 in the Nam Con Son basin offshore Vietnam. The project aims at exploiting the natural gas deposits in this field.

     

    ITEMS

    2 x Cable Laid Grommets 270mm x 131.3 meters (Circ.) CGBL 7364MT

    2 x KimSwage Flemish eye slings 127mm x 162.7 meters; MBL 1123MT Grommets and slings manufactured by KTL Offshore in Malaysia. Grommets
    were made and tested in accordance with IMCA M179. Witnessed and certified by ABS.

    Download PDF
  • Marham TP-9 Project : Cable Laid Slings (hand Spliced)
    June 2016

    BACKGROUND
    KTL Offshore (Middle East) FZC was awarded the contract to manufacture and supply the steel cable laid slings for the lifting of the TP-9 top decks for the Marham project in the Arabian Gulf (KSA). The topside weighed a massive 3,500 tons and is part of a programme covering the manufacturing and installation of four oil producing platforms and associated pipelines and power cables.

     

    ITEMS
    235mm x 38.48 meters, CSBL 1,858 MT; 2x lengths.
    235mm x 40.00 meters, CSBL 1,858 MT; 2x lengths.
    319mm x 48.18 meters, CSBL 3,707 MT; 1x length.
    319mm x 47.88 meters, CSBL 3,707 MT; 1x length.


    All manufactured and tested to IMCA M179 by KTL Offshore (Middle East) FZC in the U.A.E. Witnessed and certified by ABS.

     

    Download PDF
  • INPEX SURF Project (Australia)
    May 2016

    KTL Offshore fabricated heavy lift KimLiftTM synthetic round slings for the INPEX SURF project (subsea, umbilicals, risers and flowlines). 

    The slings will be used for this EPIC project including the pre-commissioning of production flowline systems, a MEG injection system, start-up condensate transfer and fuel gas transfer flowline systems, control systems as well as other associated SURF elements in water depths up to 275 meters. 

    The slings were manufactured to exceptionally tight length tolerances using KTL’s trademark Engineered Length Control system and tested to full proof load using our KimTest 3000 test bed. The slings were also subject to a floatation test to prove that they float in water.

    Download PDF
  • Daman Development Project (India)
    April 2016

    KTL Offshore was awarded the project to supply12 heavy lift slings for ONGC’s Daman Development Project in the Arabian Sea, offshore India. This EPIC project is expected to be completed in 2017. It will be executed in 2 phases where a total of 8 wellhead platforms will be installed and a network of 101.5km pipelines will be laid. Gas and condensate from the Daman development will be transported to Hazira through Tapti Process facilities of the Tapti-JV (KTL Offshore also previously supplied the heavy lift slings for the Tapti project). 

    KTL Offshore supplied KimLockTM cable laid slings with resin terminated spliced eyes, which provided the heavy lift contractor with a lighter rigging solution as well as a faster, easier load out and installation due to the compact terminations.

    Download PDF
  • Forward Mounted Base (FMB) Project (Qatar)
    March 2016

    KTL Offshore was awarded the heavy lift sling contract for Qatar Petroleum’s FMB (Forward Mounted Base) EPIC project which comprised a living quarter platform and utility platform with a connecting bridge. The project location was in Qatar. The scope of the contract was to supply KimFlexTM braided slings, KimLockTM resin terminated cable laid slings, KimSwageTM Flemish eyes slings as well as cable laid grommets.

    Download PDF
  • Gina Krog Project: Ultra Long Cable Laid Grommets (155 Meters Circ.)
    February 2016

    BACKGROUND
    KTL Offshore was awarded the contract to manufacture and supply the steel cable laid slings and grommets for the lifting of the MSF and other modules. The MSF module has an estimated weight of around 10,200 metric tons and in total the topside weight is approximately 17,700 metric tons.

    The Gina Krog field is located around 250 kilometers southwest of Stavanger, Norway. The development has an estimated 225 million barrels of oil and gas. The entire topside will be situated in a water depth of 116 meters.


    ITEMS
    1 x Cable Laid Grommet 309mm x 155.42 meters (Circ.) CGBL 8221 MT 1 x Cable Laid Grommet 309mm x 151.85 meters (Circ.) CGBL 8221 MT 1 x Cable Laid Grommet 309mm x 122.15 meters (Circ.) CGBL 8221 MT 1 x Cable Laid Grommet 252mm x 126.35 meters (Circ.) CGBL 5202MT 1 x Cable Laid Sling 315mm x 63.34 meters CSBL 3287MT
    1 x Cable Laid Sling 315mm x 61.08 meters CSBL 3287MT
    1 x Cable Laid Sling 258m x 61.00 meters CSBL 2200MT
    1 x Cable Laid Sling 258mm x 63.25 meters CSBL 2200MT
    All manufactured and tested to IMCA M179 by KTL Offshore in Malaysia. Witnessed and certified by ABS.
     


     

    Download PDF
  • Ivar Aasen Project
    January 2016

    KTL Offshore was awarded the contract to manufacture and supply the steel cable laid slings for the lifting of the topside modules for the Ivar Aasen project. The topside module weighed around 13,700 metric tons in total. The two main cable laid slings were ultra long at 171 meters and 167 meters length (straight pull). The slings were manufactured at our Malaysian facility and tested on our unique KimTest 3000 test bed. This is one of the largest and longest in the rigging industry, providing KTL with the ability to proof load slings up to 200 meters in length. The maximum proof load capacity of this test bed is 3,000 metric tons.

    The Ivar Aasen field is located in the North Sea, west of the Johan Sverdrup field, at a water depth of around 112m. This first phase development has an estimated production of 16,000 boe (barrels of oil equivalent) per day, increasing to 23,000 boe per day in the second phase.

    Download PDF
  • Prelude FLNG Project
    January 2016

    KTL Offshore was contracted to supply one of the highest capacity synthetic slings ever manufactured to date for the lifting of certain equipment used to construct the massive Prelude FLNG vessel. The KimLift™ slings were designed and manufactured in Singapore and proof load tested on our KimTest 3000 test bed at our facility in Malaysia. The design and development of these synthetic slings represented a breakthrough in technology for synthetic slings, due to the required strength and length of the slings. The KimLift™ slings were manufactured with Engineered Length Control™ for length accuracy under load. The load bearing structure of the slings was constructed using the most advanced HMPE yarn and spun into the optimum design at our Singapore facility. Each sling was supplied with Cordura outer body protection and a higher strength cover protection at each eye. 

    The Prelude FLNG is the world's first floating liquefied natural gas platform as well as the largest offshore facility ever constructed. It is 488 metres (1,601 ft) long, 74 metres (243 ft) wide, and made with more than 260,000 tonnes of steel. At full load, it will displace more than 600,000 tonnes, more than five times the displacement of a Nimitz-class aircraft carrier. The hull was launched in December 2013. 

    Download PDF
  • Total Badamyar field, Myanmar
    October 2015

    Located in the Andaman sea, the Yadana gas field is around 60km offshore from Myanmar. Total has signed new contracts to develop the Badamyar field and installing an additional compression platform. KTL Offshore supplied KimFlex Slings for the lifting of the topsides.

    Download PDF
  • ONGC Vasai East Development, India
    October 2015

    ONGC plans additional development of its Vasai East Field in the Arabian Sea off western India. This project, due to be completed by December 2018, is expected to add 1.83 million metric tons (2.01 million tons) of incremental oil production of 1.971 bcm (70 bcf) of gas by 2030. 

    Download PDF
  • The Maharaja Lela South (MLS) Gas Project Offshore (Brunei)
    July 2015

    The platform for the Maharaja Lela South (MLS) Project offshore Brunei will be located in water depths of 206 feet (63 meters) in the field. KTL Offshore supplied KimFlex slings to lift up the 1,200 tons jacket for the platform. 

    Download PDF
  • 2915 Metric Ton Stinger Block and Sheaves
    April 2015

    The vessel, named Derrick Lay Vessel is equipped to support advanced deepwater pipelay operations that will allow pipelines to
    be installed at depths of up to 10,000 feet. An economical vessel transit speed is expected to be 12 knots with a top speed of 14 knots. KTL Offshore supplied RopeBlock 2915MT Stinger & Strong back blocks and RopeBlock Tension block on board the vessel.